Case study · St John's Wood, NW8

Kitchen & Bathroom Refurbishment – St John’s Wood

A warm, practical refresh of a mansion-block flat — a new kitchen and a fully reworked bathroom, finished in time for Christmas.

Project facts
LocationSt John's Wood, NW8
ServiceKitchen and bathroom refurbishment
PropertyFlat in a mansion block
Bathrooms1
The brief

The flat was about to do two jobs in a row: a home for a family member, then a rental.

The brief was a warm, practical refresh to prepare the flat for the next chapter. The priority was getting everything finished before Christmas, with durable finishes that would stand up to everyday living rather than a specification chosen for photographs.

The constraint

The client was based overseas for most of the project, so every decision had to be made remotely and every visit arranged through the building’s concierge. Clear communication and predictable logistics mattered more than usual: with the client abroad, a question that would take five minutes on site instead costs a day.

The flat also contained asbestos-containing flooring, which had to be removed by a licensed contractor before any new flooring could be laid — work that happens on its own terms and cannot be compressed to suit a Christmas deadline.

Our approach

We coordinated access through the building concierge with agreed key arrangements, and shared updates at each stage so decisions could be made confidently from abroad.

We supplied and installed a new kitchen, removing the existing flooring and re-tiling the kitchen floor for a hard-wearing surface built for daily use. The bathroom was fully refurbished, taking it from a dated layout to a more contemporary space: we stripped out the existing suite and reworked the room to improve usability, repositioning the shower and WC along the back wall.

  • New kitchen supplied and installed; existing floor removed and re-tiled
  • Full bathroom refurbishment: strip-out, reconfigured layout, new vanity, new flooring, coordinated finishes
  • Electrical upgrades for safety and compliance, including replacing the plastic consumer unit with a metal board, certified on completion
  • Licensed removal of asbestos-containing flooring, followed by new flooring throughout in a warm oak tone
  • Window refurbishment including sliding double glazing and replacement of cracked panes
  • Redecoration throughout; targeted lighting updates
  • Door and ironmongery refurbishment
  • Joinery and fitted furniture installation
The outcome

The flat is bright, compliant and ready for everyday living. The new kitchen has a clean, modern look over a hard-wearing tiled floor, and the bathroom has been transformed into a more contemporary space with a smarter layout.

Combined with safer electrics, upgraded glazing, new flooring after the asbestos removal and a full redecoration, the apartment now works both for occupation and for letting — and it was handed over before Christmas, which was the client’s headline requirement.

Before and after

Next project

All projects
Full flat refurbishment
Dulwich, SE15

Full Flat Refurbishment – Dulwich

Victorian flat6 months£140,000
Full Flat Refurbishment – Dulwich
Extension & full renovation
Bow, E3

Full Renovation & Rear Extension – Bow

3 bedroomsVictorian mid-terrace
Full Renovation & Rear Extension – Bow